Project Description

Brisbane City Reach Boardwalk Remediation

Scope

  • Concrete repairs using high strength repair grout. Reinforcing repair and installation of Anodes to 90 pile caps, 60m2 of deck soffit
  • Silane protective coating treatment to 2000m2 of deck soffit
  • Epoxy coating to pile caps
  • Blast and paint 2000m2 of structural steel with 2 coats 500 microns interzone 954
  • 100% pass required on Holliday testing of Steelwork
  • Strengthening of Steel Beams
  • 10 year Workmanship Warranty provided by Ecospec

Project Details

CLIENT

Brisbane City Council

PROJECT MANAGER

McConnell Dowell

VALUE

$2.9M

Project Gallery

Get A Quote Today

At vero eos et accusamus et iusto odio dignissimos ducimus qui blanditiis praesentium voluptatum deleniti atque corrupti quos dolores et quas.

[contact-form-7 id="109"]